Rough-in | 4/27/2005 | 4/28/2005 | 4/28/2005 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/27/2005 at 12:04:42 PM. Contact: ###-####. for final 4/28/2005 10:02:46 AM
|
Final | 4/25/2005 | 4/25/2005 | 4/25/2005 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/25/2005 at 7:45:14 AM. Contact: ###-####. no elec or dissconnections to anything
|
Pressure Test | 3/30/2005 | 3/31/2005 | 3/31/2005 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/30/2005 at 8:42:33 AM. Contact: ###-####.
|
Rough-in | 3/30/2005 | 3/31/2005 | 3/31/2005 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/30/2005 at 8:42:17 AM. Contact: ###-####.
|