Final | 5/16/2005 | 5/17/2005 | 5/17/2005 | A | PASS |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 5/16/2005 at 1:51:32 PM. Contact: ###-####.
|
Final | 5/13/2005 | 5/16/2005 | 5/16/2005 | A | FAIL |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 5/13/2005 at 3:42:24 PM. Contact: ###-####.install offsett boot to miss framing and remove kink from duct under floor
|
Pressure Test | 4/4/2005 | 4/4/2005 | 4/4/2005 | P | PASS |
Dave Hannah
|
|
|
|
Rough-in | 4/1/2005 | 4/4/2005 | 4/4/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/1/2005 at 9:21:25 AM. Contact: ###-####.
|