Final | 9/2/2005 | 9/2/2005 | 9/2/2005 | A | PASS |
Bill VanDegrift
|
|
|
final ok
|
Final | 8/31/2005 | 9/1/2005 | 9/1/2005 | A | FAIL |
Troy James
|
|
|
need air ballance report for kitchen
|
Final | 8/31/2005 | 8/31/2005 | 8/31/2005 | P | CANC |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 8/31/2005 at 9:12:14 AM. Contact: ###-####. rescheduled for morning
|
Final | 8/18/2005 | 8/19/2005 | 8/19/2005 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 8/18/2005 at 12:32:08 PM. Contact: ###-####. c/n posted in esi trailer
|
Final | 6/29/2005 | 7/5/2005 | 7/5/2005 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 6/29/2005 at 10:49:13 AM. Contact: ###-####. need non-combustible material around type 1 hood at wall, vapor exhuast fan exten 2' above intake at rtu, seal grease hood at curb, need hinged at fan housing and grease receptor, smoke detector installed at units 1,2, and 9
|
Rough-in | 6/29/2005 | 7/5/2005 | 7/5/2005 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 6/29/2005 at 10:48:17 AM. Contact: ###-####.
|
Rough-in | 6/3/2005 | 6/6/2005 | 6/6/2005 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 6/3/2005 at 1:04:06 PM. Contact: ###-####. electricians drilled through grease duct, exhaust fan curb need 18" from roof
|
Rough-in | 5/24/2005 | 5/25/2005 | 5/25/2005 | A | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 5/24/2005 at 12:15:26 PM. Contact: ###-####. NOTE: call Mario 1/2 hr prior to inspection ok tocover hard lid ceiling
|
Rough-in | 4/27/2005 | 4/29/2005 | 4/29/2005 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/27/2005 at 9:12:52 AM. Contact: ###-####. need ceiling f/d at strorage room, ok duct at west wing 4/29/2005 11:08:07 AM
|