Final | 11/22/2005 | 11/23/2005 | 11/23/2005 | A | PASS |
Bill VanDegrift
|
|
|
call to verify access; Phone #: ###-#### Internet Inspection Request from: Patti Forsythe final ok gas range changed to an electric.
|
Final | 11/21/2005 | 11/22/2005 | 11/22/2005 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/21/2005 at 3:00:42 PM. Contact: ###-####...don't call until hood issue is resolved
|
Final | 11/18/2005 | 11/21/2005 | 11/21/2005 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/18/2005 at 1:16:34 PM. Contact: ###-####...need clearances above range
|
Rough-in | 7/27/2005 | 7/28/2005 | 7/28/2005 | A | PASS |
Alan Hauser
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson two 20 pound test also
|
Rough-in | 7/7/2005 | 7/7/2005 | 7/7/2005 | P | PART |
Dixie Fellows
|
|
|
We are needing a partial rough-in only at this time. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson...ok to cover bath exhausts on 3rd floor balcony
|