Final | 5/18/2005 | 5/19/2005 | 5/19/2005 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 5/18/2005 at 2:21:15 PM. Contact: ###-####.
|
Final | 5/11/2005 | 5/12/2005 | 5/12/2005 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 5/11/2005 at 3:48:02 PM. Contact: ###-####. need impact protection from vehicles to appliances in garage
|
Pressure Test | 4/15/2005 | 4/18/2005 | 4/18/2005 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 4/15/2005 at 1:14:19 PM. Contact: ###-####.
|
Rough-in | 4/15/2005 | 4/18/2005 | 4/18/2005 | A | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 4/15/2005 at 1:14:04 PM. Contact: ###-####. vapor retarder facing required on duct insulation at attic, pt ok 4/18/2005 11:48:36 AM
|