Final | 5/16/2005 | 5/17/2005 | 5/17/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 5/16/2005 at 4:17:02 PM. Contact: ###-####.
|
Rough-in | 5/12/2005 | 5/13/2005 | 5/13/2005 | A | PASS |
Alan Hauser
|
|
|
check drain at furnace in attic
|
Pressure Test | 5/11/2005 | 5/12/2005 | 5/12/2005 | P | PASS |
Alan Hauser
|
|
|
thank you; Phone #: ###-#### Internet Inspection Request from: Becky Sucher
|
Conference | 4/22/2005 | 4/25/2005 | 4/25/2005 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 4/22/2005 at 1:59:36 PM. Contact: ###-####. posted corrections..talked to journeyman 4/25/2005 9:44:50 AM
|
Rough-in | 4/21/2005 | 4/22/2005 | 4/22/2005 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 4/21/2005 at 8:38:22 AM. Contact: ###-####. called contractor to schedule conf for mon morning 4/22/2005 11:50:40 AM
|