Final | 6/15/2005 | 6/16/2005 | 6/16/2005 | A | PASS |
Alan Hauser
|
|
|
rescheduled for Alan, door locked with sign to stay off of hardwood floor til 6/16
|
Final | 6/14/2005 | 6/15/2005 | 6/15/2005 | A | NH |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 6/14/2005 at 5:01:24 PM. Contact: ###-####. door locke with sign to stay off of floors til 6/16
|
Final | 6/6/2005 | 6/7/2005 | 6/7/2005 | A | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 6/6/2005 at 4:09:40 PM. Contact: ###-####.
|
Rough-in | 4/26/2005 | 4/27/2005 | 4/27/2005 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 4/26/2005 at 12:23:21 PM. Contact: ###-####.
|
Pressure Test | 4/22/2005 | 4/25/2005 | 4/25/2005 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 4/22/2005 at 12:53:02 PM. Contact: ###-####. leak 4/25/2005 9:59:08 AM
|
Rough-in | 4/22/2005 | 4/25/2005 | 4/25/2005 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 4/22/2005 at 12:52:41 PM. Contact: ###-####. posted corrections 4/25/2005 9:59:05 AM
|