Final | 8/17/2005 | 8/18/2005 | 8/18/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/17/2005 at 3:03:32 PM. Contact: ###-####.
|
Rough-in | 4/28/2005 | 4/28/2005 | 4/28/2005 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 4/28/2005 at 11:12:44 AM. Contact: ###-####. need to see clearances when cabinets are installed 4/28/2005 3:51:09 PM
|
Rough-in | 4/26/2005 | 4/26/2005 | 4/26/2005 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 4/26/2005 at 9:05:32 AM. Contact: ###-####. need access to gas shut-off 4/26/2005 2:50:24 PM
|