Final | 8/3/2005 | 8/4/2005 | 8/4/2005 | A | PASS |
Troy James
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson
|
Final | 7/18/2005 | 7/18/2005 | 7/18/2005 | P | PART |
Troy James
|
|
|
We are needing a a final for temporary occupency. If you have any questions please call Gary Reeves @ ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson temp. c of o upon approval from fire inspector to allow fsd to be deactivated until smoke detectors are installed at fsd, need label attached to grid under fsd stating "fire smoke dampers
|
Conference | 7/12/2005 | 7/12/2005 | 7/13/2005 | P | PASS |
Dixie Fellows
|
|
|
Please call Gary Reeves @ ###-#### to arrange time. Thank You; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson...all shafts are 5/8 rocked and taped for fire assembly per troy
|
Conference | 7/6/2005 | 7/6/2005 | 7/6/2005 | A | FAIL |
Troy James
|
|
|
need to install f/d at floor ceiling per installation instructions
|
Rough-in | 6/20/2005 | 6/21/2005 | 6/22/2005 | P | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 6/20/2005 at 4:36:14 PM. Contact: ###-####. ok to cover ceiling
|
Rough-in | 5/18/2005 | 5/19/2005 | 5/19/2005 | A | PART |
Troy James
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson ok to start insulating duct, need FD at floor penetrations
|
Rough-in | 5/4/2005 | 5/4/2005 | 5/4/2005 | P | PART |
Troy James
|
|
|
Partial Rough-In Only. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson rectangular duct ok to cover at main level
|
Rough-in | 5/4/2005 | 5/5/2005 | 5/4/2005 | A | CANC |
Troy James
|
|
|
We are needing a partial rough-in inspection. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson Inspection cancelled from web by: Jennifer Jenson
|