Final | 6/20/2005 | 6/21/2005 | 6/21/2005 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 6/20/2005 at 2:24:28 PM. Contact: ###-####.
|
Pressure Test | 5/20/2005 | 5/20/2005 | 5/23/2005 | P | CANC |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 5/20/2005 at 11:16:54 AM. Contact: ###-####.
|
Rough-in | 5/20/2005 | 5/20/2005 | 5/23/2005 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 5/20/2005 at 11:16:46 AM. Contact: ###-####.
|
Pressure Test | 5/19/2005 | 5/19/2005 | 5/19/2005 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 5/19/2005 at 10:05:28 AM. Contact: ###-####.
|
Rough-in | 5/19/2005 | 5/19/2005 | 5/19/2005 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 5/19/2005 at 10:05:17 AM. Contact: ###-####. need to insulate metal return duct in attic per IRCM1601.3.4
|
Pressure Test | 5/17/2005 | 5/18/2005 | 5/18/2005 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 5/17/2005 at 1:25:19 PM. Contact: ###-####.
|
Rough-in | 5/17/2005 | 5/18/2005 | 5/18/2005 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 5/17/2005 at 1:25:08 PM. Contact: ###-####. insulate return plenum in attic, single wall connector 6" clearance required
|