Final | 8/31/2005 | 9/1/2005 | 9/1/2005 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 8/31/2005 at 11:53:54 AM. Contact: ###-####.
|
Rough-in | 5/27/2005 | 5/27/2005 | 5/27/2005 | P | CANC |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 5/27/2005 at 7:33:33 AM. Contact: ###-####. already done
|
Pressure Test | 5/12/2005 | 5/12/2005 | 5/12/2005 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 5/12/2005 at 7:41:18 AM.
|
Rough-in | 5/6/2005 | 5/9/2005 | 5/9/2005 | P | FAIL |
Alan Hauser
|
|
|
###-#### bruce pressure test failed
|