Final | 7/15/2005 | 7/15/2005 | 7/15/2005 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 7/15/2005 at 9:17:37 AM. Contact: ###-####.
|
Rough-in | 6/6/2005 | 6/7/2005 | 6/7/2005 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/6/2005 at 3:18:32 PM. Contact: ###-####.s/f dampers, bath exhausts and heat pumps all ok...heat pumps will have sensors in lieu of secondary drains...this is for dr bailey offices
|
Rough-in | 6/1/2005 | 6/1/2005 | 6/1/2005 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/1/2005 at 10:55:00 AM. Contact: ###-####....ok for cover on dryer vent..code says minimum 4" round but this was engineered...
|
Rough-in | 5/17/2005 | 5/17/2005 | 5/17/2005 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 5/17/2005 at 9:31:17 AM. Contact: ###-####....all duct sealed..will check fresh air on next inspection..duct detectors not installed yet
|