Final | 7/12/2005 | 7/13/2005 | 7/13/2005 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 7/12/2005 at 2:56:02 PM. Contact: ###-####.
|
Final | 7/8/2005 | 7/11/2005 | 7/11/2005 | A | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 7/8/2005 at 2:13:08 PM. Contact: ###-####. construction door and dead bolt lock locked
|
Final | 6/30/2005 | 6/30/2005 | 6/30/2005 | P | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 6/30/2005 at 9:18:46 AM. Contact: ###-####. need protection post
|
Pressure Test | 6/2/2005 | 6/3/2005 | 6/3/2005 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 6/2/2005 at 11:11:59 AM. Contact: ###-####.
|
Rough-in | 6/2/2005 | 6/3/2005 | 6/3/2005 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 6/2/2005 at 11:11:45 AM. Contact: ###-####.
|