Final | 7/19/2005 | 7/20/2005 | 7/20/2005 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 7/19/2005 at 11:25:39 AM. Contact: ###-####. final ok
|
Final | 7/6/2005 | 7/7/2005 | 7/7/2005 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/6/2005 at 9:38:09 AM. Contact: ###-####. need required clearance to single wall connectors
|
Pressure Test | 6/7/2005 | 6/8/2005 | 6/8/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/7/2005 at 12:10:07 PM. Contact: ###-####.
|
Rough-in | 6/7/2005 | 6/8/2005 | 6/8/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/7/2005 at 12:09:57 PM. Contact: ###-####.
|