Final | 11/8/2005 | 11/9/2005 | 11/9/2005 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 11/8/2005 at 12:46:49 PM. Contact: ###-####.
|
Final | 11/3/2005 | 11/4/2005 | 11/4/2005 | P | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 11/3/2005 at 2:57:19 PM. Contact: ###-####. need pt on bottom south unit, it failed on r/i
|
MEC-Aging Inspection | 9/28/2005 | 9/28/2005 | 9/28/2005 | | CANC |
Alan Hauser
|
|
|
|
Pressure Test | 7/28/2005 | 7/29/2005 | 7/29/2005 | P | PART |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 7/28/2005 at 3:02:47 PM. Contact: ###-####. downstairs south unit failed, other three ok.
|
Rough-in | 7/28/2005 | 7/29/2005 | 7/29/2005 | P | PASS |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 7/28/2005 at 3:02:12 PM. Contact: ###-####.
|