Final | 9/23/2005 | 9/26/2005 | 9/26/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/23/2005 at 2:58:01 PM. Contact: ###-####.
|
Rough-in | 9/2/2005 | 9/6/2005 | 9/6/2005 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/2/2005 at 2:42:33 PM. Contact: ###-####...OK TO COVER WITH CEILING TILE ON 2ND FLOOR
|
Rough-in | 8/9/2005 | 8/10/2005 | 8/10/2005 | A | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 8/9/2005 at 3:49:23 PM. Contact: ###-####. double wall vents for w/h ok
|
Rough-in | 7/13/2005 | 7/14/2005 | 7/14/2005 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 7/13/2005 at 11:38:30 AM. Contact: ###-####....ok to cover walls and ceiling in basement and 1st floor...fire dampers all in place
|
Rough-in | 7/1/2005 | 7/5/2005 | 7/5/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 7/1/2005 at 9:11:51 AM. Contact: ###-####.
|