Final | 10/19/2005 | 10/21/2005 | 10/21/2005 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 10/19/2005 at 7:58:36 AM.
|
Rough-in | 8/1/2005 | 8/1/2005 | 8/1/2005 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 8/1/2005 at 9:27:56 AM. pressure test ok and fireplace
|
Rough-in | 7/29/2005 | 8/1/2005 | 8/1/2005 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/29/2005 at 5:48:11 PM. pressure test failed
|
Rough-in | 7/15/2005 | 7/18/2005 | 7/18/2005 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/15/2005 at 2:33:26 PM. Contact: ###-####. N/R need framing around fireplace and flue installed and pressure test to gas line
|