Rough-in | 8/22/2005 | 8/23/2005 | 8/23/2005 | A | CANC |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 8/22/2005 at 2:17:02 PM. Contact: ###-####. was a final
|
Final | 8/23/2005 | 8/23/2005 | 8/23/2005 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 8/22/2005 at 2:17:02 PM. Contact: ###-####. final ok
|
Pressure Test | 7/6/2005 | 7/7/2005 | 7/7/2005 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/6/2005 at 9:37:37 AM. Contact: ###-####.
|
Rough-in | 7/6/2005 | 7/7/2005 | 7/7/2005 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/6/2005 at 9:37:23 AM. Contact: ###-####. clearance to b-vent at floor
|