Final | 10/25/2005 | 10/26/2005 | 10/26/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/25/2005 at 11:30:39 AM. Contact: ###-####.
|
Final | 10/11/2005 | 10/11/2005 | 10/11/2005 | P | PEND |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/11/2005 at 8:51:37 AM. Contact: ###-####...WAITING ON INFO FROM RITA REGARDING PERMIT BEING GROUPED TO CORRECT BLDG PERMIT
|
Pressure Test | 10/7/2005 | 10/7/2005 | 10/7/2005 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/7/2005 at 8:35:30 AM. Contact: ###-####...gas line on 20lb test to radiant htrs ok
|
Final | 10/5/2005 | 10/6/2005 | 10/6/2005 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/5/2005 at 2:33:43 PM. Contact: ###-####.
|
Pressure Test | 10/5/2005 | 10/6/2005 | 10/6/2005 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/5/2005 at 2:33:10 PM. Contact: ###-####....wrong guage
|
Pressure Test | 8/30/2005 | 8/30/2005 | 8/30/2005 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/30/2005 at 6:38:14 AM. Contact: ###-####....20lb test from reg to all kitchen equipment ok
|
Pressure Test | 8/16/2005 | 8/17/2005 | 8/17/2005 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/16/2005 at 1:47:20 PM. Contact: ###-####...met with kurt, robert (int gas) and cory to discuss regs..received specs..all ok..5lb system to kitchen drops and make-up air on roof ok
|
Rough-in | 8/10/2005 | 8/10/2005 | 8/10/2005 | A | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 8/10/2005 at 7:21:43 AM. Contact: ###-####. pressure test from ansul valve to wall at hoods ok
|