Final | 8/16/2005 | 8/17/2005 | 8/17/2005 | A | PASS |
Troy James
|
|
|
Phone #: ###-#### Internet Inspection Request from: Shelly Albrecht
|
Rough-in | 7/11/2005 | 7/12/2005 | 7/12/2005 | A | PASS |
Alan Hauser
|
|
|
Phone #: ###-#### Internet Inspection Request from: Shelly Albrecht 4 test ok, piping for shell/core only, don't know what is for future
|
Rough-in | 7/11/2005 | 7/11/2005 | 7/11/2005 | P | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Shelly Albrecht...gates locked called contractor
|