Final | 7/29/2005 | 8/1/2005 | 8/1/2005 | A | PASS |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 7/29/2005 at 12:26:49 PM.
|
Rough-in | 7/27/2005 | 7/28/2005 | 7/28/2005 | A | PART |
Dixie Fellows
|
|
|
supply and return plenums lined with metal to meet the imc requirements
|
Conference | 7/26/2005 | 7/27/2005 | 7/27/2005 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 7/26/2005 at 1:31:12 PM. Contact: ###-####...this should be a partial r/i
|
Conference | 7/12/2005 | 7/12/2005 | 7/12/2005 | P | PASS |
Dixie Fellows
|
|
|
###-#### - mike...discussed wood in supply and r/a..duct detectors..fresh air
|