Final | 4/20/2006 | 4/20/2006 | 4/20/2006 | A | PASS |
Troy James
|
|
|
|
Rough-in | 9/30/2005 | 9/30/2005 | 9/30/2005 | P | PASS |
Troy James
|
|
|
|
Final | 8/22/2005 | 8/23/2005 | 8/23/2005 | A | FAIL |
Troy James
|
|
|
cheryl; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa framing removed from flue, still need framing built for rough inspection
|
Rough-in | 7/20/2005 | 7/20/2005 | 7/20/2005 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/20/2005 at 4:56:18 AM. Contact: ###-####. need 1" clearance to flue at second level fireplace
|
Rough-in | 7/14/2005 | 7/14/2005 | 7/14/2005 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/14/2005 at 10:59:58 AM. Contact: ###-####. need flue and framing completed fireplace second level before calling for rough inspection
|