Final | 1/24/2006 | 1/24/2006 | 1/24/2006 | P | PASS |
Dixie Fellows
|
|
|
jason ###-####
|
MEC-Aging Inspection | 1/23/2006 | 1/23/2006 | 1/24/2006 | | PASS |
Dixie Fellows
|
|
|
|
Final | 11/21/2005 | 11/22/2005 | 11/22/2005 | A | PEND |
Dixie Fellows
|
|
|
jason; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles...waiting on other contractors
|
Final | 11/18/2005 | 11/18/2005 | 11/18/2005 | P | NR |
Dixie Fellows
|
|
|
jason; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
Pressure Test | 10/3/2005 | 10/3/2005 | 10/3/2005 | P | PART |
Dixie Fellows
|
|
|
20lb test to kitchen equipment ok and 20lb main to boarding house ok
|
Pressure Test | 9/30/2005 | 9/30/2005 | 10/3/2005 | P | PASS |
Dixie Fellows
|
|
|
Contact is Jayson. Thanks.; Phone #: ###-#### Internet Inspection Request from: Mike Davisson
|
Conference | 9/30/2005 | 10/3/2005 | 10/3/2005 | A | PEND |
Dixie Fellows
|
|
|
this should have been a gas test..i rescheduled this
|
Rough-in | 8/23/2005 | 8/24/2005 | 8/24/2005 | A | PART |
Dixie Fellows
|
|
|
hydronic test...100lb test ok
|
Rough-in | 8/22/2005 | 8/23/2005 | 8/23/2005 | A | NR |
Dixie Fellows
|
|
|
hydronic test...unable to make it...i rescheduled this for wed am..thanks
|
Rough-in | 8/22/2005 | 8/22/2005 | 8/22/2005 | P | FAIL |
Dixie Fellows
|
|
|
hydronic underground inspection///jason; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa.. needs 100lb test
|
Pressure Test | 7/15/2005 | 7/15/2005 | 7/15/2005 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 7/15/2005 at 6:44:55 AM. Contact: ###-####...18' u/g from alley to inside bldg ok at 20#
|