Final | 12/5/2005 | 12/5/2005 | 12/5/2005 | P | PASS |
Dixie Fellows
|
|
|
|
MEC-Aging Inspection | 12/5/2005 | 12/5/2005 | 12/5/2005 | | PASS |
Dixie Fellows
|
|
|
|
MEC-Aging Inspection | 10/3/2005 | 10/3/2005 | 10/3/2005 | | PASS |
Dixie Fellows
|
|
|
wip
|
Pressure Test | 7/29/2005 | 8/1/2005 | 8/1/2005 | A | PASS |
Lee Rice
|
|
|
don ###-#### is the office; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
Pressure Test | 7/28/2005 | 7/28/2005 | 7/29/2005 | P | PART |
Troy James
|
|
|
ON SITE CONTACT DON @ ###-####. JOB# 17236; Phone #: ###-#### Internet Inspection Request from: SUE OGLESBY pressure test ok, need to reinspect once regulators are reinstalled at unit heaters
|
Pressure Test | 7/27/2005 | 7/28/2005 | 7/28/2005 | A | FAIL |
Dixie Fellows
|
|
|
per dixie ...system needs to be a 2lb with regs at each rtu or up-size gas line to meet the ifgc...2"
|
Pressure Test | 7/26/2005 | 7/26/2005 | 7/26/2005 | P | NR |
Dixie Fellows
|
|
|
ON SITE CONTACT DON @ ###-####. JOB #17236.; Phone #: ###-#### Internet Inspection Request from: SUE OGLESBY
|