Final | 8/26/2005 | 8/29/2005 | 8/29/2005 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 8/26/2005 at 1:11:23 PM. Contact: ###-####.
|
Pressure Test | 7/29/2005 | 8/1/2005 | 8/1/2005 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 7/29/2005 at 4:35:00 PM. Contact: ###-####. gas test ok
|
Rough-in | 8/1/2005 | 8/1/2005 | 8/1/2005 | P | PASS |
Bill VanDegrift
|
|
|
ri ok
|
Pressure Test | 7/28/2005 | 7/29/2005 | 7/29/2005 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/28/2005 at 10:37:44 AM. Contact: ###-####. no test
|
Rough-in | 7/28/2005 | 7/29/2005 | 7/29/2005 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/28/2005 at 10:37:30 AM. Contact: ###-####. pressure test failed
|