Final | 8/31/2005 | 9/1/2005 | 9/1/2005 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 8/31/2005 at 10:56:09 AM. Contact: ###-####.
|
Pressure Test | 8/8/2005 | 8/9/2005 | 8/9/2005 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 8/8/2005 at 5:20:37 PM. gas test ok
|
Rough-in | 8/9/2005 | 8/9/2005 | 8/9/2005 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 8/8/2005 at 5:20:37 PM.
|
Rough-in | 8/4/2005 | 8/5/2005 | 8/5/2005 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 8/4/2005 at 2:20:19 PM. Contact: ###-####. pressure test failed
|
Pressure Test | 8/4/2005 | 8/5/2005 | 8/5/2005 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 8/4/2005 at 2:20:33 PM. Contact: ###-####.
|