Final | 10/26/2005 | 10/27/2005 | 10/27/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/26/2005 at 4:28:41 PM. Contact: ###-####.
|
Final | 10/24/2005 | 10/25/2005 | 10/25/2005 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/24/2005 at 12:37:54 PM. Contact: ###-####....crimps in dryer vent going wrong direction..need manuf installation specs for both gas ranges
|
Rough-in | 8/10/2005 | 8/11/2005 | 8/11/2005 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 8/10/2005 at 3:27:49 PM. Contact: ###-####.
|
Pressure Test | 8/10/2005 | 8/11/2005 | 8/11/2005 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 8/10/2005 at 3:27:23 PM. Contact: ###-####.
|
Pressure Test | 8/9/2005 | 8/10/2005 | 8/10/2005 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 8/9/2005 at 8:46:51 AM. Contact: ###-####. no gas piping installed
|
Rough-in | 8/9/2005 | 8/10/2005 | 8/10/2005 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 8/9/2005 at 8:46:23 AM. Contact: ###-####. not ready for inspection, insulation shield at b-vent in attic, no gas piping installed
|