Final | 9/9/2005 | 9/12/2005 | 9/12/2005 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 9/9/2005 at 2:56:40 PM. Contact: ###-####.
|
Pressure Test | 8/11/2005 | 8/12/2005 | 8/12/2005 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 8/11/2005 at 11:58:49 AM. Contact: ###-####. gas test ok
|
Rough-in | 8/11/2005 | 8/12/2005 | 8/12/2005 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 8/11/2005 at 11:58:36 AM. Contact: ###-####. ri ok
|