Final | 11/21/2005 | 11/22/2005 | 11/22/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/21/2005 at 2:40:30 PM. Contact: ###-####.
|
Rough-in | 11/1/2005 | 11/2/2005 | 11/2/2005 | A | PART |
Dixie Fellows
|
|
|
meet ben at 8:00 # ###-####..ok to cover lid in kitchen and basement..ducts in room on roof all ok and ready to wrap
|
Rough-in | 11/1/2005 | 11/1/2005 | 11/1/2005 | P | CANC |
Dixie Fellows
|
|
|
meet ben at 8:00 ####-####
|
Rough-in | 10/31/2005 | 11/1/2005 | 11/1/2005 | P | DEFR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/31/2005 at 3:24:18 PM. Contact: ###-####....unable to meet ben this afternoon..i rescheduled this for wed morning at 8:00
|
Rough-in | 9/14/2005 | 9/15/2005 | 9/15/2005 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/14/2005 at 10:31:00 AM. Contact: ###-####...dishwasher duct in shaft all floors ok
|
Rough-in | 9/7/2005 | 9/7/2005 | 9/7/2005 | P | PART |
Dixie Fellows
|
|
|
Rough in inspection for 3rd flr shaft grease duct aprove for wrap. Job foreman Stan cell ####-####; Phone #: ###-#### x189 Internet Inspection Request from: Steve Tow...ok to wrap grease duct 3rd floor shaft
|
Conference | 9/1/2005 | 9/2/2005 | 9/2/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/1/2005 at 10:49:21 AM. Contact: ###-####...met with lowell and bill carter to discuss w/h comb air and venting
|
Rough-in | 9/1/2005 | 9/2/2005 | 9/2/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/1/2005 at 8:56:55 AM. Contact: ###-####...ok to cover grease duct 2nd floor..all wrapped
|
Rough-in | 8/26/2005 | 8/29/2005 | 8/29/2005 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/26/2005 at 2:36:32 PM. Contact: ###-####...ok to wrap grease duct 2nd floor
|
Rough-in | 8/18/2005 | 8/19/2005 | 8/19/2005 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/18/2005 at 1:56:34 PM. Contact: ###-####...wrap on gease duct from basement ok
|
Rough-in | 8/11/2005 | 8/12/2005 | 8/12/2005 | A | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 8/11/2005 at 2:18:01 PM. Contact: ###-####. ok to wrap gease duct above hard lid ceiling
|