Final | 10/18/2005 | 10/19/2005 | 10/19/2005 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/18/2005 at 10:02:01 AM. Contact: ###-####.
|
Rough-in | 8/16/2005 | 8/16/2005 | 8/16/2005 | P | PASS |
Alan Hauser
|
|
|
|
Pressure Test | 8/15/2005 | 8/16/2005 | 8/16/2005 | A | PASS |
Alan Hauser
|
|
|
james; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Pressure Test | 8/11/2005 | 8/12/2005 | 8/12/2005 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 8/11/2005 at 2:07:35 PM. Contact: ###-####. gas test failed
|
Rough-in | 8/11/2005 | 8/12/2005 | 8/12/2005 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 8/11/2005 at 2:07:00 PM. Contact: ###-####. gas test failed
|