Final | 9/9/2005 | 9/12/2005 | 9/12/2005 | A | PASS |
Dixie Fellows
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore..job finaled
|
Final | 9/8/2005 | 9/8/2005 | 9/8/2005 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/8/2005 at 7:32:46 AM. Contact: ###-####...talked to contractor about what was needed from the engineer
|
Final | 9/6/2005 | 9/7/2005 | 9/7/2005 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/6/2005 at 1:22:05 PM. Contact: ###-####...not ready for a final...equipment not set and connections not made
|
Pressure Test | 8/19/2005 | 8/19/2005 | 8/22/2005 | P | PASS |
Dixie Fellows
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa..20lb test to kit equipment ok..correct reg used on roof off 5lb system to 7" psi...will check correct kitchen connects on final
|
Pressure Test | 8/18/2005 | 8/19/2005 | 8/19/2005 | A | FAIL |
Dixie Fellows
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa....bad guage
|
Rough-in | 8/18/2005 | 8/19/2005 | 8/19/2005 | A | PART |
Dixie Fellows
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|