Final | 1/26/2006 | 1/26/2006 | 1/26/2006 | P | PASS |
Troy James
|
|
|
|
Rough-in | 9/1/2005 | 9/1/2005 | 9/1/2005 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/1/2005 at 9:54:46 AM. Contact: ###-####.
|
Rough-in | 8/30/2005 | 8/31/2005 | 8/31/2005 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/30/2005 at 1:18:07 PM. Contact: ###-####...insulation and plastic still to close to back of f/p
|
Rough-in | 8/19/2005 | 8/22/2005 | 8/22/2005 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/19/2005 at 4:21:43 PM. Contact: ###-####.//F/P too close to insulation
|