Final | 4/5/2006 | 4/5/2006 | 4/5/2006 | A | PASS |
Troy James
|
|
|
|
Final | 2/28/2006 | 2/28/2006 | 2/28/2006 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 2/28/2006 at 2:34:09 AM. Contact: ###-####.
|
Final | 2/14/2006 | 2/14/2006 | 2/14/2006 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 2/14/2006 at 6:57:45 AM. Contact: ###-####. no access
|
Rough-in | 9/13/2005 | 9/13/2005 | 9/13/2005 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 9/13/2005 at 7:31:04 AM. Contact: ###-####.
|
Rough-in | 9/6/2005 | 9/6/2005 | 9/6/2005 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 9/6/2005 at 10:36:57 AM. Contact: ###-####.need 1" clearance at sides of fireplaces from combustibles per installation instructions
|