Final | 10/27/2005 | 10/28/2005 | 10/28/2005 | A | PASS |
Alan Hauser
|
|
|
final - dave; Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen
|
Final | 10/25/2005 | 10/26/2005 | 10/26/2005 | A | FAIL |
Alan Hauser
|
|
|
Final Internet Inspection Request from: Brandon Sorensen corrections ignored
|
Rough-in | 10/24/2005 | 10/25/2005 | 10/25/2005 | A | PASS |
Alan Hauser
|
|
|
rough-in Internet Inspection Request from: Brandon Sorensen
|
Conference | 9/14/2005 | 9/14/2005 | 9/14/2005 | P | PART |
Alan Hauser
|
|
|
duct ok, no grid or diff. hook up
|
Conference | 9/13/2005 | 9/14/2005 | 9/14/2005 | A | PART |
Alan Hauser
|
|
|
Ductwork seal inspection before insulation.; Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen duct ok, no grid or diff. hook up yet
|