Final | 11/3/2005 | 11/3/2005 | 11/3/2005 | P | PASS |
Dixie Fellows
|
|
|
###-#### - john
|
Conference | 9/20/2005 | 9/23/2005 | 9/23/2005 | A | PASS |
Dixie Fellows
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles...met with john and discussed correction notice
|
Final | 9/19/2005 | 9/20/2005 | 9/20/2005 | A | FAIL |
Dixie Fellows
|
|
|
corrections..will meet contractor fri am 8:30
|
Pressure Test | 9/16/2005 | 9/19/2005 | 9/19/2005 | A | NH |
Dixie Fellows
|
|
|
check regulators...called home-owner at ###-####
|
Pressure Test | 9/15/2005 | 9/15/2005 | 9/19/2005 | P | PASS |
Dixie Fellows
|
|
|
rob --need a 2 lb test; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...60lb test ok..waiting on regs to be installed
|
Pressure Test | 9/14/2005 | 9/14/2005 | 9/14/2005 | P | FAIL |
Dixie Fellows
|
|
|
2 # test insp rob ###-#### ...NO WORK STARTED AT THIS JOB YET...REINSPECTION FEE
|