Final | 12/8/2005 | 12/8/2005 | 12/8/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/8/2005 at 3:48:35 AM. Contact: ###-####.
|
Rough-in | 9/29/2005 | 9/29/2005 | 9/29/2005 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/29/2005 at 8:11:39 AM. Contact: ###-####.
|
Rough-in | 9/16/2005 | 9/19/2005 | 9/19/2005 | P | PART |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Shelley Baisch...re-call when concrete board installed...talked to doug
|