Final | 12/19/2005 | 12/19/2005 | 12/19/2005 | P | PASS |
Alan Hauser
|
|
|
|
Pressure Test | 12/19/2005 | 12/19/2005 | 12/19/2005 | A | PASS |
Alan Hauser
|
|
|
rob ###-####
|
Final | 12/16/2005 | 12/19/2005 | 12/19/2005 | A | PASS |
Alan Hauser
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Final | 12/15/2005 | 12/16/2005 | 12/16/2005 | P | CANC |
Alan Hauser
|
|
|
bonnie ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Inspection cancelled from web by: Letitia Mesa ///cancelled per Bonnic w/Air Care 12/16/05 11:06am LEG
|
Final | 12/12/2005 | 12/13/2005 | 12/13/2005 | P | FAIL |
Alan Hauser
|
|
|
finish cond. drain and remove vent limitor at mp regulator for new rtu and expose covered gasline and put under pressure for inspection
|
Pressure Test | 10/18/2005 | 10/18/2005 | 10/18/2005 | P | PASS |
Alan Hauser
|
|
|
rob--re-insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Pressure Test | 10/17/2005 | 10/17/2005 | 10/17/2005 | P | FAIL |
Alan Hauser
|
|
|
###-#### - rob gasline under a building has to be in a sleeve and vented to the outdoors and sealed tight and interior termination of sleeve
|
Pressure Test | 10/14/2005 | 10/17/2005 | 10/16/2005 | A | CANC |
Alan Hauser
|
|
|
robb - ###-####
|
Pressure Test | 10/13/2005 | 10/13/2005 | 10/13/2005 | P | FAIL |
Dixie Fellows
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa..you can't install plastic gas pipe under a building
|