Final | 11/21/2005 | 11/21/2005 | 11/21/2005 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 11/21/2005 at 9:03:02 AM. Contact: ###-####.
|
Final | 11/17/2005 | 11/18/2005 | 11/18/2005 | P | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 11/17/2005 at 10:15:43 AM. Contact: ###-####. left c/n with general contractor
|
Rough-in | 10/11/2005 | 10/12/2005 | 10/12/2005 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 10/11/2005 at 4:39:54 PM. Contact: ###-####.
|
Pressure Test | 10/11/2005 | 10/12/2005 | 10/12/2005 | A | CANC |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 10/11/2005 at 4:40:23 PM. Contact: ###-####.
|