Final | 11/30/2005 | 11/30/2005 | 11/30/2005 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 11/30/2005 at 11:23:07 AM. Contact: ###-####.
|
Final | 11/23/2005 | 11/25/2005 | 11/25/2005 | A | FAIL |
Alan Hauser
|
|
|
no flue connector at water heater
|
Pressure Test | 10/26/2005 | 10/27/2005 | 10/27/2005 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/26/2005 at 1:21:05 PM. Contact: ###-####.
|
Rough-in | 10/26/2005 | 10/27/2005 | 10/27/2005 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/26/2005 at 1:20:50 PM. Contact: ###-####.
|