Conference | 1/27/2009 | 1/28/2009 | 1/28/2009 | A | PASS |
Dixie Fellows
|
|
|
meet contractor at 11:00--###-####--met with home-owner to discuss her concerns over primary drain from upstairs furnace
|
Pressure Test | 12/26/2006 | 12/27/2006 | 12/27/2006 | A | FAIL |
Dixie Fellows
|
|
|
New Construction Final Gas Pressure Test Inspection. Door Code # 2241; Phone #: ###-#### Internet Inspection Request from: Sharon Ginter..couldn't find a guage..called sharon
|
Final | 12/18/2006 | 12/19/2006 | 12/19/2006 | A | PASS |
Dixie Fellows
|
|
|
jessie ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
Rough-in | 11/14/2005 | 11/15/2005 | 11/15/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/14/2005 at 4:18:31 PM. Contact: ###-####.
|
Rough-in | 11/4/2005 | 11/7/2005 | 11/7/2005 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/4/2005 at 2:34:54 PM. Contact: ###-####...posted corrections for r/i...gas ok
|