Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberMEC05-03605
StatusFinaled
Name ARCTIC AIR
Site Address 3645 N CARTWRIGHT RD
Project Name 
Customer Number 
ePlanReview 
Description
Mechanical Permit - New: HVAC install in new home, Includes both forced air an radiant in floor tubing.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final10/4/200610/5/200610/5/2006APASS
DetailsDixie Fellows
Phone #: ###-#### Internet Inspection Request from: Wade Huskey
Final10/3/200610/4/200610/4/2006AFAIL
DetailsDixie Fellows
MEET WADE AT 10:30..NEED MANUF SPECS FOR BOILER THAT HAS THE ACTUAL MODEL # ON IT TO MATCH THE BOILER ON JOB..COMPLETE RANGE EXHAUST..NEED DRAIN PAN UNDER FURNACE IN ATTIC
Final10/2/200610/3/200610/3/2006APEND
DetailsDixie Fellows
If you can’t make it late morning, please come in afternoon. Please do not come before 11:00 AM; Phone #: ###-#### Internet Inspection Request from: Wade Huskey
Final9/28/20069/28/20069/28/2006PNR
DetailsDixie Fellows
House will be open; Phone #: ###-#### Internet Inspection Request from: Wade Huskey..hi wade, i called don and ask him to have all mech contractors call for their finals at one time..this will save me 3 or 4 trips to the same house..thanks alot dixie
Rough-in12/7/200512/7/200512/7/2005PPASS
DetailsDixie Fellows
I will meet you there and remove any insulation that is covering what you need to see.; Phone #: ###-#### Internet Inspection Request from: Wade Huskey
Rough-in12/6/200512/6/200512/6/2005AFAIL
DetailsDixie Fellows
Phone #: ###-#### Internet Inspection Request from: Wade Huskey...covered with insulation..20lb gas test ok
Pressure Test12/6/200512/6/200512/6/2005APASS
DetailsDixie Fellows
Phone #: ###-#### Internet Inspection Request from: Wade Huskey
Rough-in11/21/200511/21/200511/21/2005PPART
DetailsDixie Fellows
contact name: Wade; Phone #: ###-#### Internet Inspection Request from: Wade Huskey...100lb test on all hydronics ok
Rough-in11/4/200511/4/200511/4/2005PPART
DetailsDixie Fellows
This is a preliminary rough in and pressure test. Builder needs to get framing inspection before we install radiant tubing. We will be getting another inspection before sheetrock.; Phone #: ###-#### Internet Inspection Request from: Wade Huskey