Final | 1/10/2006 | 1/10/2006 | 1/10/2006 | P | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-#### Internet Inspection Request from: william kerwin final ok
|
Rough-in | 11/21/2005 | 11/21/2005 | 11/21/2005 | P | PASS |
Troy James
|
|
|
bj; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Pressure Test | 11/16/2005 | 11/17/2005 | 11/17/2005 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 11/16/2005 at 10:03:19 PM. Contact: ###-####.
|
Rough-in | 11/16/2005 | 11/17/2005 | 11/17/2005 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 11/16/2005 at 10:02:41 PM. Contact: ###-####.c/n posted
|