Final | 1/30/2006 | 1/30/2006 | 1/30/2006 | P | PASS |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 1/30/2006 at 8:23:32 AM. Contact: ###-####.
|
Final | 1/17/2006 | 1/18/2006 | 1/18/2006 | P | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/17/2006 at 3:27:03 PM. Contact: ###-####. Inspection cancelled from web by: Barbara Moore
|
Pressure Test | 11/30/2005 | 12/1/2005 | 12/1/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/30/2005 at 4:07:46 PM. Contact: ###-####.....20lb ok
|
Rough-in | 11/30/2005 | 12/1/2005 | 12/1/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/30/2005 at 4:07:17 PM. Contact: ###-####.
|