Final | 3/21/2006 | 3/21/2006 | 3/21/2006 | P | PASS |
Bill VanDegrift
|
|
|
|
Final | 3/20/2006 | 3/21/2006 | 3/21/2006 | A | PASS |
Bill VanDegrift
|
|
|
THANKS, ANDREA.; Phone #: ###-#### Internet Inspection Request from: Andrea Creek
|
Final | 3/20/2006 | 3/20/2006 | 3/20/2006 | P | FAIL |
Bill VanDegrift
|
|
|
Thanks, Andrea.; Phone #: ###-#### Internet Inspection Request from: Andrea Creek kitchen range ok still needs furnace flue termination completion.
|
Conference | 3/16/2006 | 3/17/2006 | 3/17/2006 | A | PASS |
Dixie Fellows
|
|
|
please call Erik Kirschner at ###-#### to meet you. Thanks, Andrea.; Phone #: ###-#### Internet Inspection Request from: Andrea Creek...discussed clearance from range to overhead and side cabinets..furnace flue termination on outside of building not per manufacturer
|
Final | 3/14/2006 | 3/15/2006 | 3/15/2006 | P | FAIL |
Dixie Fellows
|
|
|
Scarlet ; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong..POSTED CORRECTIONS..LEFT BRIAN A MESSAGE TO CALL ME
|
Rough-in | 12/20/2005 | 12/21/2005 | 12/21/2005 | A | PASS |
Troy James
|
|
|
Thanks, Andrea.; Phone #: ###-#### Internet Inspection Request from: Andrea Creek
|
Rough-in | 12/17/2005 | 12/19/2005 | 12/19/2005 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 12/17/2005 at 9:55:00 AM. Contact: ###-####. cover all of metal duct at return and insulate joist space against rim board, need nail plate at csst in kitchen
|
Rough-in | 12/15/2005 | 12/16/2005 | 12/16/2005 | P | FAIL |
Dixie Fellows
|
|
|
thanks, Andrea.; Phone #: ###-#### Internet Inspection Request from: Andrea Creek..all corrections not done
|
Rough-in | 12/14/2005 | 12/15/2005 | 12/15/2005 | P | FAIL |
Dixie Fellows
|
|
|
Thanks, Andrea.; Phone #: ###-#### Internet Inspection Request from: Andrea Creek
|
Pressure Test | 12/14/2005 | 12/15/2005 | 12/15/2005 | P | PASS |
Dixie Fellows
|
|
|
Thanks, Andrea.; Phone #: ###-#### Internet Inspection Request from: Andrea Creek
|