Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberMEC05-03833
StatusExpired
Name DE BEST PLUMBING INC
Site Address 404 S 8TH ST
Project NameBODO BLDG #8
Customer Number0364
ePlanReview 
Description
Mechanical Permit - New: Gas piping & hydronics
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Expired4/11/20074/11/20074/11/2007PPASS
DetailsDixie Fellows
expired permit
MEC-Aging Inspection4/11/20074/11/20074/11/2007 PEND
DetailsDixie Fellows
Rough-in1/31/20072/1/20071/31/2007ANR
DetailsDixie Fellows
blair - boiler inspection; Phone #: ###-#### Internet Inspection Request from: Victoria Beall..waiting for state boiler inspector
Pressure Test1/12/20071/16/20071/16/2007APART
DetailsDixie Fellows
Mechanical room and pool room. If you call Shane, ###-#### he can show you where the pool area is. Phone #: ###-#### x0000...20lb test to boiler in mech room ok..60lb test to both pool heaters ok..mentioned comb air openings to
MEC-Aging Inspection12/5/200612/5/200612/5/2006 PASS
DetailsDixie Fellows
work still in progress
Final10/3/200610/3/200610/3/2006ACANC
DetailsTroy James
call larry ###-####
no final at this time
Rough-in10/3/200610/3/200610/3/2006APASS
DetailsTroy James
call larry ###-####
gas piping complete to all appliances
Final9/29/20069/29/200610/2/2006PCANC
DetailsTroy James
Please call Larry with any questions ###-####; Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
rescheduled with larry for 10-3-06 am
MEC-Aging Inspection9/12/20069/12/20069/12/2006 PASS
DetailsDixie Fellows
hotel..wip
Rough-in7/13/20067/13/20067/13/2006PPASS
DetailsTroy James
larry Note: 5th floor - hydronics ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Pressure Test6/19/20066/19/20066/20/2006PPASS
DetailsTroy James
Larry; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
11th floor hydronic ok to cover, need to verify test later
Rough-in6/12/20066/13/20066/13/2006PPASS
DetailsTroy James
larry - ###-#### Note: 10th floor Hydronics
Rough-in5/22/20065/23/20065/24/2006PPASS
DetailsTroy James
Larry, ###-#### - 9th floor
test for hydronics
Pressure Test5/17/20065/17/20065/17/2006PPASS
DetailsTroy James
8th floor hydronics
Pressure Test5/16/20065/17/20065/17/2006AFAIL
DetailsTroy James
pt for the 8th floor//please call larry when on way ###-####
Pressure Test5/16/20065/16/20065/16/2006PFAIL
DetailsTroy James
larrry - ###-#### - Note: 8th floor
Pressure Test5/15/20065/15/20065/15/2006PPEND
DetailsDixie Fellows
8th floor larry- ###-#### -re-insp -call 1st before insp ..called larry to reschedule this for tues am..this was troy's inspection and i didn't realize it in time for troy to get it done today..sorry
Rough-in5/2/20065/2/20065/3/2006PPASS
DetailsTroy James
mandy Note: 7th floor; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
hydronic 7th floor ok
Rough-in5/1/20065/1/20065/1/2006PPASS
DetailsTroy James
7th floor//Larry ###-####
ok north half of hydronics
Rough-in4/26/20064/26/20064/26/2006PPASS
DetailsTroy James
larrry - ###-####
ok the rest of the hydronic tests for 6th floor
Rough-in4/24/20064/25/20064/25/2006APART
DetailsDixie Fellows
larry- ###-#### ...1/2 of 6th floor hydronics on 100lb test ok
Rough-in4/24/20064/24/20064/24/2006PPART
DetailsDixie Fellows
larry ###-#### hydronics on 6th floor
Pressure Test3/7/20063/8/20063/8/2006APASS
DetailsDixie Fellows
Please call Larry with any questions ###-####; Phone #: ###-#### Internet Inspection Request from: Sonja Hankel..100lb test ok
MEC-Aging Inspection1/25/20061/25/20061/25/2006 PASS
DetailsDixie Fellows
wip
Pressure Test11/22/200511/22/200511/23/2005PPASS
DetailsDixie Fellows
Please call Larry with any questions ###-####; Phone #: ###-#### Internet Inspection Request from: Sonja Hankel...witnessed by kurt with int gas at 20lb