Final | 4/6/2006 | 4/7/2006 | 4/7/2006 | A | PASS |
Alan Hauser
|
|
|
|
Final | 4/5/2006 | 4/6/2006 | 4/7/2006 | A | PASS |
Alan Hauser
|
|
|
FINAL; Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen
|
Final | 2/23/2006 | 2/24/2006 | 2/24/2006 | A | PART |
Troy James
|
|
|
alan ###-#### terry ###-#### temporary final for book store only
|
Rough-in | 1/17/2006 | 1/18/2006 | 1/18/2006 | P | PART |
Alan Hauser
|
|
|
rough-in; Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen ALL METAL ABOVE GRID CEILING TO BE INSULATED R-5
|
Rough-in | 1/6/2006 | 1/6/2006 | 1/6/2006 | P | PART |
Alan Hauser
|
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen insulate sq. to rd in high ceiling area, then ok for tile
|
Conference | 12/2/2005 | 12/5/2005 | 12/5/2005 | A | PASS |
Alan Hauser
|
|
|
Dave Tully - conference; Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen
|