Final | 6/19/2006 | 6/19/2006 | 6/19/2006 | P | PASS |
Alan Hauser
|
|
|
air care - call 1/2 hr prior for access/reinsp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
Final | 5/5/2006 | 5/5/2006 | 5/5/2006 | P | FAIL |
Alan Hauser
|
|
|
no gasline hooked up at water heater
|
Pressure Test | 12/9/2005 | 12/12/2005 | 12/12/2005 | A | PASS |
Alan Hauser
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Rough-in | 12/9/2005 | 12/12/2005 | 12/12/2005 | A | PART |
Alan Hauser
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles need to finish framing at 2nd floor framing
|
Pressure Test | 12/2/2005 | 12/5/2005 | 12/5/2005 | A | FAIL |
Dixie Fellows
|
|
|
###-#### - air care...gas line not installed yet???
|
Rough-in | 12/2/2005 | 12/5/2005 | 12/5/2005 | A | FAIL |
Dixie Fellows
|
|
|
###-#### - air care...posted corrections..called john
|