Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberMEC05-04051
StatusFinaled
Name YMC INC
Site Address 495 S CAPITOL BLVD
Project NameBODO BLDG #8
Customer Number21330
ePlanReview 
Description
12/7/2005 - (Hampton Inns Hotel) floor 1 thru 4 - HVAC shell & Core - $39,850.00 per initial cert of value cmc //Final value is $43,885//3/21/07 LEG
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final1/29/20071/29/20071/29/2007PPASS
DetailsTroy James
Rough-in12/29/200612/29/200612/29/2006PPASS
DetailsTroy James
troy
inspected pool heaters
MEC-Aging Inspection12/26/200612/26/200612/29/2006 PEND
DetailsTroy James
wip
MEC-Aging Inspection10/23/200610/23/200610/24/2006 PEND
DetailsTroy James
wip
Rough-in8/23/20068/23/20068/24/2006PPASS
DetailsTroy James
cover drop ceiling at meeting rooms 5th floor
Rough-in8/1/20068/2/20068/2/2006APASS
DetailsTroy James
stair pressurization fans
Rough-in7/20/20067/20/20067/20/2006PPASS
DetailsTroy James
lobby
ok to cover t-bar ceiling
MEC-Aging Inspection7/10/20067/10/20067/12/2006 PASS
DetailsDixie Fellows
wip
MEC-Aging Inspection5/8/20065/8/20065/8/2006 PASS
DetailsDixie Fellows
this is for bodo's which is a large project.. work in progress
Final3/6/20063/6/20063/6/2006PPART
DetailsTroy James
temp occ for parking garage floors 1,2, and 3. FSD penatrating 1st floor from TI spaces not required to be smoke dampers therefore no smoke detection required
Rough-in3/1/20063/1/20063/1/2006PPART
DetailsTroy James
smoke exhuast in garage CO detector ok,
still need smoke detection device at fsd in tenant space exhaust fans and at corridor by fire pump room
Rough-in2/16/20062/17/20062/17/2006AFAIL
DetailsTroy James
Scheduled by a contractor via Hello! on 2/16/2006 at 12:02:15 PM. Contact: ###-####. need c/o detectors installed and fans wired, need to verify operation
Conference1/30/20061/31/20062/2/2006ACANC
DetailsLee Rice
Scheduled by a contractor via Hello! on 1/30/2006 at 3:06:31 PM. Contact: ###-####.
Conference1/25/20061/26/20061/26/2006APEND
DetailsDixie Fellows
meet lee and forest at 8:30..delivered meno regarding life safety issues.
Conference1/24/20061/25/20061/25/2006APEND
DetailsDixie Fellows
meet Lee and Forrest at 8:30..forest unable to meet us..will try for thurs am
Conference1/18/20061/19/20061/19/2006APASS
DetailsDixie Fellows
meet bob at 9:00..mary from fire will be there as well..problem with installing duct detectors in lobby per plan..contractor will contact engineer to determine how to resolve this issue
Conference1/17/20061/18/20061/18/2006APEND
DetailsDixie Fellows
Scheduled by a contractor via Hello! on 1/17/2006 at 2:12:00 PM. Contact: ###-####... i rescheduled this for thurs am and will meet bob at 9:00
Rough-in1/12/20061/13/20061/13/2006APART
DetailsTroy James
bob ###-####
ok to cover duct in soffic area at garage, heat duct installed to keep fire sprinkler lines from freezing, not part of original design
Rough-in1/12/20061/12/20061/12/2006PCANC
DetailsTroy James
bob ###-####
rescheduled inspection for tomarrow