Final | 1/4/2006 | 1/4/2006 | 1/4/2006 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/4/2006 at 9:04:03 AM. Contact: ###-####.
|
Rough-in | 1/3/2006 | 1/3/2006 | 1/3/2006 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/3/2006 at 10:22:23 AM. Contact: ###-####...framing around f/p not complete
|
Rough-in | 12/22/2005 | 12/22/2005 | 12/22/2005 | P | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/22/2005 at 8:42:04 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Dec 22 2005 9:31AM.
|
Rough-in | 12/20/2005 | 12/20/2005 | 12/20/2005 | P | FAIL |
Troy James
|
|
|
Phone #: ###-#### Internet Inspection Request from: Shelley Baisch framing not complete, I guess owner waiting for the correct fireplace to be installed
|