Final | 3/30/2006 | 3/31/2006 | 3/31/2006 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 3/30/2006 at 2:24:54 PM. Contact: ###-####.
|
Final | 3/14/2006 | 3/14/2006 | 3/15/2006 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/14/2006 at 10:38:50 AM. Contact: ###-####...temp ok..waiting on one room to be finished before final...no card on site
|
Rough-in | 1/18/2006 | 1/18/2006 | 1/18/2006 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/18/2006 at 10:36:55 AM. Contact: ###-####.
|
Rough-in | 1/12/2006 | 1/12/2006 | 1/12/2006 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 1/12/2006 at 10:06:53 AM. Contact: ###-####. c/n posted, exhaust fans not complete, need to verify at final
|
Rough-in | 1/10/2006 | 1/11/2006 | 1/11/2006 | P | PEND |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/10/2006 at 9:37:29 AM. Contact: ###-####...out of time..i called chad to reschedule for thurs
|